Termites
Termite Inspection
Step 1. Arrive at home and park on street
Step 2. Clock in PP
Step 3. Greet client and tell them your name, the company you are representing and that you are there to do a termite inspection
Step 4. Install booties
Step 5. Inform client areas of the house you will be inspecting and approx. how long it will take you to inspect.
Step 6. Inform client that once you are finished you will go over the findings with them
Step 7. Start in the basement and inspect all areas conducive to termites, box sills, all wooden members of the structure. If there is a crawl space you must go inside and inspect it
Step 8. Begin inspect the 1st & 2nd floors and inside garage
Step 9. Inspect outside perimeter of structure
Step 10 Take pictures of any suspected areas of concern or damage
Step 11 Discuss findings with the client
Step 12 Complete PP
Step 13 Clock out PP
Wood Destroying Inspect Report
- Arrive at home and park on street
- Clock in PP
- Greet client and tell them your name, the company you are representing and that you are there to do a WDI inspection
- Install booties
- Inform client areas of the house you will be inspecting and approx. how long it will take you to inspect.
- Inform client that once you are finished you will go over the findings with them
- Start in the basement and inspect all areas conducive to termites, box sills, all wooden members of the structure. If there is a crawl space you must go inside and inspect it
- Begin inspect the 1st & 2nd floors and inside garage
- Inspect outside perimeter of structure
- Take pictures of any suspected areas of concern or damage
- Discuss findings with the client
- Complete PP
- Clock out PP
Termite Renewal
- Arrive at home and park on street
- Clock in PP
- Greet client and tell them your name, the company you are representing and that you are there to do a termite inspection
- Go into PP, under activities choose Sentricon icon
- Locate 1st station using the RFID scanner
- Scanner will blink white color when station is located
- Take termite pliers and remove top cap
- Using termite pliers extract bait from station
- Inspect bait to see if any activity has been in station
- Replace bait if needed, place back in station, secure cap to top of station
- Record results in PP after each station
- Repeat steps 5-11 until finished
- Give results to client
- Collect payment necessary
Installing Sentricon Baiting System
Step 1:
Lay stations every 10 feet apart and 2-4 feet away from the foundation. Clock into PP
Step 2:
Install stations 10 feet apart and 2-4 feet away from foundation Drill a 12-14” hole into the soil with the gas powered drill auger
Step 3:
Gently push the station into the soil flush with ground level
Sentricon Installation
1.Park truck on curb/street in front of customers home
2.Clock into Pest Pac
3.Grab a pair of booties(don’t put on yet)
4.Walk up to front door by using the sidewalk(do not walk in yard)
5.Ring doorbell and step back so customer has room to open the door
6.Introduce yourself with “Either Good Morning or Good Afternoon, I’m “your name” with Environmental Pest Management”, all while making eye contact with customer and give a firm hand shake
7.Let Customer know you are there for their Sentricon Installation
8.If spot treatment is needed, ask to come inside. Before stepping inside place booties on.
9.Let them know which areas on the interior are being spot treated for termites.
10.Complete spot treatment and head outside to start installation.
11.Take pictures of the front, back, and sides of the structure you are treating. After make a drawing of the structure
12.Measure the structure of the building with a measuring wheel and mark North, South, East, and West on the drawing
13.Lay stations 6-10 feet apart, preferably 2-4 feet away from the foundation of the building
14.Drill a 12-14 inch hole into the soil with the augar
15.Place Sentricon station into the hole until the station sits flush with the ground
16.Mark on drawing of map where each station was placed. Write total amount of stations and total linear feet on the margins of the drawing
17.Do spot treatment with Termidor HE if necessary. Take pictures of the area where there is live termite activity and or damage
18.In PP, enter total number of stations installed on item line
19.In PP, enter chemical and number of stations
20.In PP, notate how many stations where installed, if spot treatment was completed and if pictures were loaded in PP
21.email everything to office manager- Kristi Williams including pictures
22.Clock out of PP
Admin. Only – Pre Installation
Step 1. Enter location in PP
Step 2. Click on “New Service Setup”
Step 3. Enter Service Type “Sentricon Check” EVERY time. (this is to set up the renewal each year.
- Enter Address in description line that is to be serviced annually
- Enter Amount of renewal price
- Click on INITIAL SERVICE
1.Enter Service Date
2.Frequency is Annual
3.Enter time and duration of install
- initial service is Sentricon New
5.Enter price & Tech that completed
- Schedule is Annual in the month installed
- Scroll down to Sentricon setup box
1.Type in linear feet from contract
2.elect install date
- Select product type – always active
4.Click add
Admin. Only – Post Installation
- Step 1.Click on order that was generated and post to a new batch
- a. Edit with address of install
- b. Release batch
- c. Email invoice to customer
- Step2. Entering number of Devices
- a. Once invoice has been posted, click on the White Sentricon Service Setup
- b. Scroll down and click on “Devices” which is shaded
- c. Click multiple devices
- d. Select device type AA
- e. Enter number of stations installed
- f. Click save
- Step 3: Once installer sends office field notes- this is what you do next
- Step 4: Print all documents
- Step 5: Add to master green folder
- Step 6: Load documents into PP
- a. save the contract desktop
- b. go to location in PP
- c. click on documents
- d. add document
- e. upload file from desktop
- f. name the file in PP
- e. save
- Step 7: file master folder
- Step 8: file by year & month
- Step 9: add name, address, renewal date to renewal spreadsheet